Electrodomésticos integrados
We can supply and install the appliances. If you keep any, tell us the model so we can adjust the opening and ventilation.
Galley kitchens in Elche: compare facing units, walkway space and access to sockets and meters before you choose your layout. Bespoke planning advice.
Includes a sketch with doors, windows and visible connections.
State which units, appliances or installations you wish to keep.
Tell us what you need, from measuring and design through to installation.
Photos of @mis.cocinas
View everything on InstagramA modern made-to-measure kitchen starts with order: fewer things on view, more hidden storage and surfaces that are easy to clean.

For pots and pans, a drawer that pulls out fully leaves the back in view. We choose the runners according to the weight you are going to store.
The dividers keep lids upright and plates in place when opening. We measure your largest items so we can leave them the space they need.
In an L-shaped kitchen, pull-out trays bring the contents of the corner closer to the door. We check that they can come out without hitting the handle of the adjoining unit.
Reserve the top shelf for platters and small appliances used occasionally. What you use daily stays on the shelves within easy reach.
We can supply and install the appliances. If you keep any, tell us the model so we can adjust the opening and ventilation.
Damp cloth and neutral soap, no scouring pads. Porcelain and quartz need no treatment. Check hinges and drawers from time to time.
Day 0
you approve the 3D design
Fabricación
After approving the design and finishes
Instalación
Depending on the agreed scope
Done
clean and connected kitchen

We work with the measurements of your space. The plan shows where to place the purchase, how to open the appliances and which passage remains free.

Tell us what you will store in each area. We can distribute crockery, pots and provisions between drawers, shelves and tall units.

We propose finishes and mechanisms from Blum, Hettich or Salice depending on the opening you need. The quote identifies which reference goes into each unit.
We can assess the furniture with the appliances you already have, or quote the supply and installation of appliances. Indicate which ones you want to keep.
First, draw up a plan showing the exact position of sockets, the meter and stopcocks before fixing the units. In a galley kitchen both runs share the same services wall, so it is also worth reviewing the technical recommendations in the IKEA article (in Spanish) on gaps and heights before assembly.
The estimate is an indicative figure calculated from approximate measurements, useful for getting an initial idea of the cost. The final quote is finalised once plans, finishes and connections are confirmed. Our guide to kitchen pricing explains which variables cause the difference between the two figures.
It is advisable to request two independent quotes: one for the furniture and worktops, and another for electrical work, plumbing or building work. This way each item can be compared separately and it is easier to spot whether any part has been underpriced, without renegotiating the whole project when an adjustment arises.
In narrow walkways, the door and drawer swings of both runs can invade the circulation space at the same time. Before deciding on a galley layout, it is worth reviewing our guide to narrow kitchens or considering a one-wall kitchen if the available width does not allow a comfortable passage.
After viewing the digital simulation, simply indicate which details need adjusting, such as hood height, socket position or walkway width, and request a personalised review based on the actual floor plan. You can start the process from the home page before confirming your furniture order.
In our standard range we combine Emuca hinges with Emuca or GTV drawer runners. We also work with Blum, Hettich and Salice to equip your kitchen with soft-close, full-extension drawers or lift-up doors. Your quote details the brand, model and finish of each fitting.

Select the municipality and project type to prepare your request.
Bespoke modern kitchens
At MisCocinas we know that choosing between two facing runs of units or a single line of work surface is one of the first questions when refurbishing a kitchen in Elche. A galley layout places units on both sides of the walkway, multiplies the working area and calls for careful thought about the available width, cabinet door swings and access to sockets, meters and connections. In this article we compare when this layout makes sense compared with a one-wall kitchen, what to check before fixing measurements, and how to move from a first estimate to a firm quote.
Before drawing any plan, it is worth asking whether the real space can accommodate two facing runs without the kitchen becoming uncomfortable to use every day. A galley layout works well when there is a wide enough walkway between both runs to open the oven, the dishwasher or a low drawer without bumping into the person cooking on the opposite side. If that width is not available, the usual alternative is a one-wall kitchen, which concentrates all the units along a single wall and frees the rest of the room for passage or a table.
In Elche we come across both new-build homes with generous kitchens and refurbished flats with narrow corridors inherited from older layouts. In the latter cases, before committing to two facing runs, it is worth reviewing our guide to narrow kitchens, which explains the minimum widths that allow circulation to be kept without giving up tall cabinets or integrated appliances. The choice between galley and one-wall does not depend only on aesthetics: it determines how many people can move through the kitchen at once and whether the units can open fully without obstruction.
Imagine a kitchen about 2.40 metres wide in a flat in central Elche, with a cooking and sink run on one wall and, opposite it, tall units with an integrated fridge. If the lower drawers on both runs open at the same time, the clear walkway shrinks suddenly and may feel awkward for two people cooking together. Checking this detail before the units are manufactured avoids surprises on installation day.
A common solution is to alternate the depth of the modules, keeping the main working run with standard-depth cabinets and the storage run with narrower tall units, so that the combined door swings do not invade the walkway. It also helps to place appliances that are left open for long periods, such as the oven or dishwasher, on the side with more free clearance. Planning circulation around how the household actually moves through the kitchen, and not only on paper, usually makes the difference between a galley layout that works and one that falls short in daily use.
One of the most common mistakes when fitting a galley kitchen is deciding the position of the cabinets first and only then discovering that a socket, the electricity meter or a stopcock is hidden behind a fixed unit. To avoid this, it is advisable to draw up a plan showing the exact location of all connections, including water, gas, electricity and ventilation, before finalising the layout.
Manufacturers of modular furniture often publish technical recommendations on passage gaps and socket heights; for example, the customer service article from IKEA (in Spanish) explains how to coordinate installations with the assembly of modular kitchens, a useful reference for understanding what information an electrician needs before fitting the fronts. In a galley layout this step is even more important, because both runs share the same services wall and a measuring error can force pipework that is already installed to be moved. Fixing the connections first and the unit positions afterwards saves time and avoids costly changes halfway through the work.
Once the layout has been decided, it is worth distinguishing between an indicative estimate and the final quote. The first is useful for getting an idea of the cost range based on approximate measurements of the space; the second is finalised when the plans, finishes and connections have been confirmed, so it is more reliable for comparing options. Our guide to kitchen pricing explains which variables usually influence the jump from an indicative figure to the final amount.
It is also advisable to request separate quotes for the furniture and for the other trades, such as electrical work, plumbing or building work, rather than a single overall figure. In this way each item can be compared separately, you can spot whether any part has been underpriced and adjust the project without having to renegotiate the whole budget. In a galley kitchen, where there tends to be more linear metres of units than in a one-wall layout, this separation helps you understand which part of the cost relates to cabinets and worktops and which to installing the lighting, water and ventilation points needed for both runs to work properly.
A digital simulation lets you visualise how the two facing runs will look, but it does not replace a review of the actual floor plan of the home. After seeing the initial proposal it is common to spot details that need adjusting: the height of a hood, the position of a socket or the exact width of the walkway. Requesting that personalised review before closing the project prevents the galley layout from remaining an attractive image that later does not fit the building work.
If you have a space in Elche and want to check whether it allows two facing runs with a comfortable walkway, you can start by visiting our home page and requesting a first estimate using the measurements of your kitchen. And if, after seeing the simulation, you notice that something does not add up, such as a hidden socket or a cabinet that does not open fully, ask for the personalised review before confirming your furniture order. That extra step is what turns a plan on paper into a galley kitchen you can really use every day.